INDONESIA - NUSANTARA |
|
|
1,140MW Suralaya Coal-fired Steam Power Plant, Jawa Barat
(Product supplied: ASTM A325/A490 High Strength Structural Bolts, F959 Direct Tension Indicators, etc.)
|
2 x 615MW Paiton Coal-fired Steam Power Plant (Units 7 & 8), Jawa Timur
(Product supplied: ASTM A325/A490 High Strength Structural Bolts, F959 Direct Tension Indicators, etc.)
|
|
|
630MW Rembang Coal-fired Steam Power Plant, Jawa Tengah
(Product supplied: JIS B1186 F10T Structural Bolts, DIN 931/934 Machine Bolts, Foundation Bolts, etc.)
|
945MW Teluk Naga Coal-fired Steam Power Plant, Jawa Barat
(Product supplied: Mechanical Rebar Splicing Couplers, Rebar Threading Machines, etc.)
|
|
|